Annonces du Bateau AppRéalisez votre rêve aujourd'hui
OuvrirNon Merci!2024 Thornycroft NEW Thornycroft TK-60 57hp Marine Diesel Engine & Gearbox Package
11 679 €
Dorset
Thornycroft NEW Thornycroft TK-60 57hp Marine Diesel Engine & Gearbox Package | 57ch | 2024
11 679 €
Dorset
Fabricant | Thornycroft |
Modèle | NEW Thornycroft TK-60 57hp Marine Diesel Engine & Gearbox Package |
Année | 2024 |
Puissance Moteur | 57ch |
Localisation | Dorset |
Type de Moteur / Essence | Diesel |
État | Occasion |
2024 Thornycroft NEW Thornycroft TK-60 57hp Marine Diesel Engine & Gearbox PackageNew Thornycroft TK-60 57hp @ 3000RPM Four Cylinder Heat Exchanger Cooled Marine Diesel Engine With PRM 150D2 Gearbox, Control Panel, 4.0M Wiring Extension Harness & Flexible Engine Mountings. Fully CE and RCDII compliant for leisure and commercial use. Regular retail price of £12,122 Inc VAT We can then offer an amazing discount of £2,424 when you part exchange your old engine. Running or non-running, so long as it was manufactured after 1980 it will qualify under the trade in scheme. This gives a total payable of £9,698 Inc VAT Further options over and above the standard specification are available as follows: Gearbox Options: PRM150 D1.5 PRM150 D2 PRM150 D3 PRM280 D2 PRM280 D3 Technodrive TM345A1.5 Technodrive TM345A2.0 Technodrive TM345A2.47 Engines can also be supplied as Bobtail (no gearbox) or fitted with an adaptor to suit an existing gearbox. Adaptor Plate Options: Adaptor & Drive Plate To Suit PRM125 / PRM150 / TMC60 Adaptor & Drive Plate To Suit PRM260 / PRM 280 Adaptor & Drive Plate To Suit Borg Warner / ZF Hydraulic / SAE7 Engines are available with a choice of Standard or Deluxe Control Panels with a choice of 4.0M, 6.0M and 8.0M Extension Harnesses with fully waterproofed harness connectors. We can also offer a range of useful engine options to include: PTO Stub Shaft On Crank Hot Water Connections For Calorifier Deck Wash Pump Second Alternator (100A) Most standard spec models are in stock ready for fast delivery and bespoke builds are generally on a 6-8 week lead time. Contact us today to discuss your repower project.
Voir plus